Back to Projects
Project 04 · Bridge engineering

Karatia River Bridge

Hedia, Canning-II, Sundarban

DPR preparation for a proposed bridge and approaches over the Karatia River at Hedia, under Atharobanki Gram Panchayat, Canning-II.

River surveysStructural designEstimation
Illustrative bridge engineering photograph
Location
Hedia, Canning-II, Sundarban
Commissioning organisation
Sundarban Development Board, Civil Engineering Division No. IV
Service
Detailed Project Report consultancy
The assignment

Project overview

Consultancy scope

  • Topographical, hydrographical and traffic surveys.
  • Detailed soil reporting for pile-depth determination.
  • River discharge calculations and hydrological data.
  • Structural design, reinforcement details and general arrangement drawings.
  • Estimates for the bridge and approaches, with the specified vetting.

Work order dated 7 July 2025. This page describes the documented consultancy assignment; it does not imply that construction is complete.